20MW
Critical Load Capacity
40MWh
On-Site Battery Storage
1.15 PUE PUE
PUE Guaranteed
Q4 2023
Space Available

Located at Spain's central fiber and logistics hub a few minutes South of downtown Madrid, with direct low latency links to undersea cables in Bilbao, Barcelona and Lisbon.

Prime location

  • Near Spain's commercial and political capital and the largest concentration of data centres and cloud services in Southern Europe

  • Diverse protected fibre connections direct to the undersea cable landings in Bilbao, Barcelona and Lisbon

  • 15 minute drive to Central Madrid, located on the main North-South highway to Madrid with Getafe Industrial Metro station nearby

© Mapbox, © OpenStreetMap
© Mapbox, © OpenStreetMap
  • Built-in resiliency

    with advanced microgrid capability with two hours of onsite battery storage

  • Continuous systems monitoring

    and secure DCIM controls platform covering all mechanical and power systems

  • 100% renewable energy

    via new contracted solar development in Spain for carbon neutral operations

  • Estimated “six nines” of availability

    with Tier III design standards and N+1 power, UPS and cooling systems

  • Densities to 40 kW per cabinet

    provide flexibility to accommodate rapidly evolving business needs

  • Leading energy efficiency

    with 1.15 annualized PUE and zero water for cooling

Sustainable by design

1.15 PUE (power usage effectiveness)

Edged data centres deliver industry-leading annualized PUE even in the hottest climates.

1.15 PUE
Edged PUE
1.46 PUE
Europe Average PUE (Uptime Institute)
Learn More

Zero-water cooling

Advanced water-neutral cooling systems deliver an industry first for hot climates: a WUE of zero liters per kWh of compute.

Learn More

Resources

By clicking “Accept All Cookies”, you agree to the storing of cookies on your device to enhance site navigation, analyze site usage, and assist in our marketing efforts. View our Privacy Policy for more information.