100MW
Critical Load Capacity
1.15 PUE PUE
PUE Guaranteed

A vibrant new center for AI research and high speed computing in the Lisbon region, which enjoys a booming digital economy and a convergence of many undersea cable networks.

Take the virtual tour
  1. Rail station
    ~20 minutes to Parque das Nações
  2. Commercial offices with retail, restaurant on base level
  3. Data halls
  4. Administrative building
  5. Parking with EV charging and solar

Prime location

  • Ten intercontinental submarine cables land or stop near Lisbon. Two were recently completed and one is under construction.

  • Lisbon is known for high quality of engineering talent at a competitive cost, with extremely high level of English language proficiency

  • Located ~20 minutes to the booming Parque das Nações district at the new Castanheira do Ribatejo rail station

  • Pedestrian-oriented campus includes five data center buildings, two premium office buildings and administrative buildings

© Mapbox, © OpenStreetMap
© Mapbox, © OpenStreetMap
  • Rack Density

    Supports 70 kW/rack with air cooling and up to 200 kW/rack with plug and play liquid cooling integration

  • Estimated “six nines” of availability

    with Tier III design standards and N+1 power, UPS and cooling systems

  • Leading energy efficiency

    with waterless cooling and 1.15 average PUE across our portfolio

  • 100% renewable energy

    via new contracted solar development for carbon neutral operations

  • Continuous systems monitoring

    and secure DCIM controls platform covering all mechanical and power systems

  • Advanced resiliency

    with planned microgrid capability and long-term onsite battery storage

Sustainable by design

1.15 PUE (power usage effectiveness)

Edged data centers deliver industry-leading annualized PUE even in the hottest climates.

1.15 PUE
Edged PUE
1.46 PUE
Europe Average PUE (Uptime Institute)
Learn More

Zero-water cooling

Advanced water-neutral cooling systems deliver an industry first for hot climates: a WUE of zero liters per kWh of compute.